How Electromagnetic Overload Relay works?

66
rate or flag this page

By prasannasutrave


How Electro-magnetic Overload Relay works?

 

Overload Relays are used to protect Electric Motor from failure due to high current drawn by motor.Electric motor has 33% of it's cost in total Air Compressor

unit,so it is our duty to protect Electric Motor from any type of failure.Overload Relays are the only solutation to protect motor from high current.Overload

Relays are generally of two types one is "Electro-magnetic" and another is "Thermal".

I have already given details about Thermal Overload Relay in past.In this post,you will find details about "Electro-magnetic Overload Relay" which is

somewhat outdated now a days,but still some old Air Compressor units are having these type of Relays.

The Electro-magnetic Overload Relays consist of a coil or solenoid carrying the line current (or a portion of it through current transformers) with an armature

which when attracted sufficiently operates the release circuit or latch.A time lag feature is in corporated to guard against unnecessary operation from

temporary Overloads due to the normal operation of the machines which are being driven.Time lag is obtained by means of Dash pot (otherwise the

action would be practically instantaneous) fitted to the Oil Circuit Breaker (OCB) controlling the stator circuits.

Construction and Adjustment of Dash pot.

The time lag consist of BODY CASTING,MOVEABLE PLUNGER,OIL RETAINING SCREW CUP.The moveable plunger comprises the core of the Overload

release,to which is fitted a specially shaped brass disc moving in a restriction in the body casting,by turning the screw cap the position of the disc within

the restriction is varied.

The time lag are despatched dry and must filled with special time lag oil (SAE-60 grade) provided in seperate containers in the Circuit Breaker.While fitting

remove screw "A".It is not necessary to remove the bottom cup "B" and on no account should screw "C" be removed.Adjustment of the Overload setting is

made by slackening screw "D" and sliding the body casting up or down,until the top face coincides with the calibration marking required on the calibration

tube,screw "D' is then tightened.The bottom rotatable cup "B" is now described reset themselves after operation within few second.

This type of Overload Relays are very simple in operation but due care must taken for accurate operation.All the marks "A","B","C"&"D" are embossed on

respective spaces,you have to indentify first before working on "Electro-magnetic Overload Relay".

For more details,please visit

http://www.pnengineering.blogspot.com/

Comments

RSS for comments on this Hub

No comments yet.

Submit a Comment

Members and Guests

Sign in or sign up and post using a hubpages account.


optional


  • No HTML is allowed in comments, but URLs will be hyperlinked
  • Comments are not for promoting your hubs or other sites

working