• Hubs
  • tagged high precision equipment
87

The Seven Wastes

The Chief Engineer for Toyota during the mid-1900 was Taiichi Ohno. Ohno is given credit for creating the Toyota Production System (TPS) and creating the seven wastes. Toyota defines waste as being...

1 comment    toyota manufacturing waste
working