Building a brick base

Updated on August 21, 2018

Typical concrete foundation on sloping site

This is a typical stepped foundation, note the concrete steps in the foundation should be set in such a way that they are as high as one course or several courses of bricks, or blocks or whatever it is going to be laid on them if possible.
This is a typical stepped foundation, note the concrete steps in the foundation should be set in such a way that they are as high as one course or several courses of bricks, or blocks or whatever it is going to be laid on them if possible. | Source

Explaining, bricklaying on a sloping site

Welcome to our article ((10-G2) (36)), building a brick base

Dear readers, this is the continuation of our last article, DIY brickwork, where we were describing how to lay bricks and build a house brick base. Now, this imaginary brick base that we are going to build happens to be on a sloping site; anyhow, we want to show you how this bricklaying is going to be done; I believe that the best thing to do is to talk to you in a way that seems as if we are really building this house brick base step by step, so, let us start building it this way.

Now, whenever one starts to build something, it is necessary to have a plan, but in this case because the job is not real we don’t have a plan, therefore, we have to assume certain aspects of the job that is ahead of us, as if there is a real plan; so, let us say that we are building this rectangular house brick base, which is about 8 meters wide and 12 meters long, it happens to be built on a sloping site. Now, the foundations have already been laid by the concreters and there are several concrete steps in it, because of the slope in the land. Because the foundation is not level and has got steps in it; the bricklayers need to pay attention about the foundation levels more than usual. They cannot just lay the bricks and follow the foundations levels, as set from the concreters, because they might be different for many reasons. In building every tradesman is responsible about his own work, so, it would be wise to be careful that you don’t make mistakes, and if the trade before you have made a small mistake try to adjust it, without making too much fuss if you can.

In this case of a stepped foundation, it is very hard to set all the steps of the foundations exactly at the right level, for the bricklayers to lay bricks on them without checking the levels, one of the reasons could be because the steps in the concrete foundation may not be the same gauge of the brickwork that we are going to lay, or other unforeseen things. So, how we should proceed.

As we have already explained in our previous article about levels, we have already marked the level on the profiles and stretched a tight line above the southern brick wall; from this level line we can check the levels on the southern brick wall. Now, to make things easy let us start just with one working bricklayer, and let us assume that the bricklayer has marked the outside boundary corners and has started to lay a few bricks on the foundation, he is building a corner four bricks high at the lowest corner of the house, he has chosen to make the corner only four brick high because from his measurement he knows that there is a difference of three bricks in the foundation, therefore his fourth brick on the corner that he is building now is going to be level with the first brick on the opposite corner, having built his corner four bricks high and having laid his firs brick on the other corner, now he can stretch his brickies line between these two points and start working his stretcher bond from his lowest corner, making sure that the bricks he lays are laid in line and level.

Let me explain a bit more here, in bricklaying it is important that the entire building is set in stretcher bond from the start, even if there are other types of bonds that are going to be used in the brickwork, because the stretcher bond is always the main bond, as this bond will continue throughout the building; therefore the bricklayer cannot build the other corner until he runs a full course in stretcher bond from the first corner that he has built at the start, once he has done that, he can proceed to build both corners higher if we wants.

--------------------------------

Timber house on a brick base

Brick base can fulfill several roles, what is shown here is a timber house on a brick base. This particular brick base seems to be also part of the living space of the house.  Other brick base may just be there for other reasons.
Brick base can fulfill several roles, what is shown here is a timber house on a brick base. This particular brick base seems to be also part of the living space of the house. Other brick base may just be there for other reasons. | Source

How we proceed to build this brick base

Now to make it easy and clear, let us describe it another way, let us assume that the lowest corner of the house foundation is the South East corner, the South West corner is three bricks higher than the South East corner and the other corners are even higher than these two corner, as I am going to explain to you later, while we keep building this brick base. Now as I have said the bricklayer has built this corner four bricks high and laid one brick at the west corner as marked, so, he is ready to lay bricks on the entire wall, but before he does that he double check everything and with his gauge rod he checks from his line level that he has set above, or with the water level that his fourth brick in the eastern corner is level with his first brick on the west corner, let us assume that they are level and they are the same course of bricks.

Now he can start laying bricks in stretcher bond, from the South East corner working his way to the west corner, he sets his brickies line as he sees fit making sure that the levels and the alignment are right, when he reaches the fourth course, which is the first full course in this wall he tries to work out if he can start this whole wall without cutting any bricks by increasing or decreasing the perpendicular joints between the bricks, if he cannot achieve that, then one brick has got to be cut a bit shorter; smaller pieces are to be avoided as they are unsightly and they weaken to wall. While doing this job, one has to keep in mind that in a face brick wall the perpendicular joints become unsightly if they are bigger than the bed joint, therefore it is better to keep the perpendicular joints smaller than the bed joint.

Now that the first course of bricks in stretcher bond has been laid from corner to corner, the bricklayer will lay bricks in the inside of this brickwork, if it is just a one brick thick wall he will lay the bricks right against the bricks he has already laid, but if it is a cavity wall then he has to set his inside wall as specified, most time this space between the walls is about 50mm. Now that the lowest wall has been set he moves to work on the eastern wall, since this is the second lowest wall in this house brick base.

----------------------------------

Just a simple lowset brick base

A brick base being built for a long and narrow house. Note there is only one row of columns in the middle.
A brick base being built for a long and narrow house. Note there is only one row of columns in the middle.

Working on the eastern brick wall

The eastern stepped concrete foundation is a longer foundation and it has a difference in level of about 1.2 meter and this will be about 15 courses of bricks.

First of all the bricklayer stretches the external line and a level tight line above the eastern wall, from these two lines he can check all the outside alignment and the levels, then he checks and lays his first bricks on the foundation as required near the first concrete step, making sure that this brick is level with one of the four bricks in the eastern corner, as he has a four brick high corner he might lay one to four brick next to the concrete steps. I have to say here that it is very hard to explain just by writing a text, how exactly everything is done, but in building everything is plain common sense and one must use his own imagination to see how things can be done.

Anyhow, let us assume that the bricklayer has laid his bricks and now he is running his stretcher bond, from the south eastern corner to the north eastern corner of the house and the fourth course of bricks has been laid and the inside brick has been laid. At this point of time the bricklayer needs to build the south eastern corner higher to proceed with the works, unless another bricklayer is doing that for him. You see, I have started writing this article as if there is a single bricklayer on the site at the beginning, but I was doing that because that is the best way to show you how we can start this brick base correctly.

Anyhow, at this point of time the bricklayer wants to add a couple more courses on the walls that have been started, so that his walls in this corner of the brick base are higher than the ground, and then, the trench can be back filled at this corner of the house, making it easier for him and everybody else to work on level ground.

Now, before he does that he needs to check what other things need to be done, he notes that there is an opening for a door after he lays another three or four courses of bricks and that he needs to reinforce his brickwork with some brick mesh reinforcement before the opening occurs, and there is also a dampcourse to be laid at the opening level, this dampcourse is only needed in this lower part of the base, because they are going to lay a concrete floor and build a couple of rooms under the house. The dampcourse is a thin layer of material that stops the dampness passing through from one level to another; it works both ways depending on the way it is laid.

In the specifications says that this reinforcement is needed every four courses and under and above all openings. So, he lays his mesh reinforcement on the walls and builds another corner three brick high, this is the level where the first opening occurs, and it is also the level of the damp course. Here we need to note that it is easier to understand what is happening that this south eastern corner, which now is seven bricks high form the foundation, at this point of time it is better that all the brickwork in the lower base is built to this level.

Once you have all the brickwork level, the dampcourse is laid according to the specification, and the first problem is solved in this lower part of the brick base. So, now the bricklayer/s can continue to build above the damp course higher corners, as they did when they started, or if they want they can set bricklayer profiles if they are available, since now the brick walls at this lower end of the house are set at the right level and alignment.

----------------------

Laying brick, single brick in stretcher bond

This photos shows a bricklayer trowel and how it is used to cut the mortar while laying bricks, you can note also that the top brick has been laid level with the line.
This photos shows a bricklayer trowel and how it is used to cut the mortar while laying bricks, you can note also that the top brick has been laid level with the line. | Source

Bricklaying for a house requires team work

On the description written above, we have started and assumed as if there was only one bricklayer on the job, but, to build a brick base a small gang of bricklayers and labour/s are needed, say two or three bricklayers and a labour. Sometimes there are no strict rules on the job and they can help each other. Mind you this can only work with small gangs and the bricklayer foreman is there to guide the team and help whoever needs help. On large team everyone has his own job to do, and when the unions have a say, they want you to do only your own job and nothing else, so, sometimes the unions are not very helpful, but then again, they need to have their own rules otherwise they cannot exist.

Anyhow let us go back to building this house brick base, as there are a lot more things to be done before we set the whole brick base and then build it to the height required.

Now that the first part of the base has been started, the bricklayers have still to be careful to start the rest of the base correctly, so, they continue to lay brick and check for levels and alignments’ as they have done before, by building one wall at a time and a course at a time, until they bring all the brickwork level with the first brick on the foundation on the highest corner of the house foundation, here again everything must be checked and rechecked again, in order to make sure that everything is level and set at the right alignment and above all that there is no mistake (pig) in the brickwork, to make a hundred per cent sure, all the walls must be built at this level and then proceed to build everything to the finish height required.

I believe that this article is becoming too long, because of the explanations that are required, and the amount of data that must be kept in mind from our readers, if they are really trying to learn how this brickwork needs to be done, so, it might be better if we write another article and talk about what is going-on on the work site, while we are building this house brick base, where we will also explain, what is meant by a pig in the brickwork.

To make it easy for you to follow our article, our next article link is pasted here for you to continue whenever you are ready, House brick base continues

See you soon.

------------------------------------------

Comments

    0 of 8192 characters used
    Post Comment

    • F-Menchise profile imageAUTHOR

      F-Menchise 

      6 years ago from Brisbane Australia

      Thanks Armchair Builder for taking the time to comment on my hub. If you have your own hubs I would like to read some of them, thanks again.

    • Armchair Builder profile image

      Michael Luckado 

      6 years ago from Hawaii

      Thanks for sharing. People forget how much is involved in some of these skilled home building activities.

    working

    This website uses cookies

    As a user in the EEA, your approval is needed on a few things. To provide a better website experience, hubpages.com uses cookies (and other similar technologies) and may collect, process, and share personal data. Please choose which areas of our service you consent to our doing so.

    For more information on managing or withdrawing consents and how we handle data, visit our Privacy Policy at: https://hubpages.com/privacy-policy#gdpr

    Show Details
    Necessary
    HubPages Device IDThis is used to identify particular browsers or devices when the access the service, and is used for security reasons.
    LoginThis is necessary to sign in to the HubPages Service.
    Google RecaptchaThis is used to prevent bots and spam. (Privacy Policy)
    AkismetThis is used to detect comment spam. (Privacy Policy)
    HubPages Google AnalyticsThis is used to provide data on traffic to our website, all personally identifyable data is anonymized. (Privacy Policy)
    HubPages Traffic PixelThis is used to collect data on traffic to articles and other pages on our site. Unless you are signed in to a HubPages account, all personally identifiable information is anonymized.
    Amazon Web ServicesThis is a cloud services platform that we used to host our service. (Privacy Policy)
    CloudflareThis is a cloud CDN service that we use to efficiently deliver files required for our service to operate such as javascript, cascading style sheets, images, and videos. (Privacy Policy)
    Google Hosted LibrariesJavascript software libraries such as jQuery are loaded at endpoints on the googleapis.com or gstatic.com domains, for performance and efficiency reasons. (Privacy Policy)
    Features
    Google Custom SearchThis is feature allows you to search the site. (Privacy Policy)
    Google MapsSome articles have Google Maps embedded in them. (Privacy Policy)
    Google ChartsThis is used to display charts and graphs on articles and the author center. (Privacy Policy)
    Google AdSense Host APIThis service allows you to sign up for or associate a Google AdSense account with HubPages, so that you can earn money from ads on your articles. No data is shared unless you engage with this feature. (Privacy Policy)
    Google YouTubeSome articles have YouTube videos embedded in them. (Privacy Policy)
    VimeoSome articles have Vimeo videos embedded in them. (Privacy Policy)
    PaypalThis is used for a registered author who enrolls in the HubPages Earnings program and requests to be paid via PayPal. No data is shared with Paypal unless you engage with this feature. (Privacy Policy)
    Facebook LoginYou can use this to streamline signing up for, or signing in to your Hubpages account. No data is shared with Facebook unless you engage with this feature. (Privacy Policy)
    MavenThis supports the Maven widget and search functionality. (Privacy Policy)
    Marketing
    Google AdSenseThis is an ad network. (Privacy Policy)
    Google DoubleClickGoogle provides ad serving technology and runs an ad network. (Privacy Policy)
    Index ExchangeThis is an ad network. (Privacy Policy)
    SovrnThis is an ad network. (Privacy Policy)
    Facebook AdsThis is an ad network. (Privacy Policy)
    Amazon Unified Ad MarketplaceThis is an ad network. (Privacy Policy)
    AppNexusThis is an ad network. (Privacy Policy)
    OpenxThis is an ad network. (Privacy Policy)
    Rubicon ProjectThis is an ad network. (Privacy Policy)
    TripleLiftThis is an ad network. (Privacy Policy)
    Say MediaWe partner with Say Media to deliver ad campaigns on our sites. (Privacy Policy)
    Remarketing PixelsWe may use remarketing pixels from advertising networks such as Google AdWords, Bing Ads, and Facebook in order to advertise the HubPages Service to people that have visited our sites.
    Conversion Tracking PixelsWe may use conversion tracking pixels from advertising networks such as Google AdWords, Bing Ads, and Facebook in order to identify when an advertisement has successfully resulted in the desired action, such as signing up for the HubPages Service or publishing an article on the HubPages Service.
    Statistics
    Author Google AnalyticsThis is used to provide traffic data and reports to the authors of articles on the HubPages Service. (Privacy Policy)
    ComscoreComScore is a media measurement and analytics company providing marketing data and analytics to enterprises, media and advertising agencies, and publishers. Non-consent will result in ComScore only processing obfuscated personal data. (Privacy Policy)
    Amazon Tracking PixelSome articles display amazon products as part of the Amazon Affiliate program, this pixel provides traffic statistics for those products (Privacy Policy)